Add pnpm.overrides.elliptic to prevent version regression on
the transitive elliptic vulnerability (CVE-2025-14505).
Vulnerability path:
@kinvolk/headlamp-plugin → vite-plugin-node-polyfills →
node-stdlib-browser → crypto-browserify → browserify-sign → elliptic
Note: pnpm audit will still report the vulnerability until
upstream publishes elliptic 6.6.2+. This override safeguards
against pulling a worse version.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* chore: replace Dependabot references with Renovate
- SECURITY.md: update to mention Renovate (org-wide Mend Renovate)
- PROJECT_ASSESSMENT.md: mark Renovate as integrated (org-wide config)
Closes PRI-389. Parent PRI-387.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* fix: override picomatch >=4.0.4 and vite >=6.4.2 to patch high-severity vulnerabilities
Resolves 3 high-severity vulnerabilities from pnpm audit:
- GHSA-c2c7-rcm5-vvqj: Picomatch ReDoS via extglob quantifiers (>=4.0.0 <4.0.4)
- GHSA-p9ff-h696-f583: Vite arbitrary file read via dev server WebSocket
- GHSA-4w7w-66w2-5vf9: Vite path traversal in optimized deps .map handling
Also addresses moderate GHSA-3v7f-55p6-f55p (picomatch method injection).
Remaining vulnerabilities (moderate/low) are in transitive dependencies
managed by @kinvolk/headlamp-plugin and @headlamp-k8s/eslint-config
which require upstream updates to those packages.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
---------
Co-authored-by: Chris Farhood <chris@farhood.org>
Co-authored-by: Paperclip <noreply@paperclip.ing>
The E2E workflow and deploy scripts were targeting the legacy
privilegedescalation-dev namespace, which is not managed by Flux GitOps
in privilegedescalation/infra.
The infra repo (PR #11) already provisions the headlamp-dev namespace
and corresponding RBAC (e2e-ci-runner-headlamp-rbac.yaml) that grants
the ARC runner SA (runners-privilegedescalation-gha-rs-no-permission in
arc-runners) the permissions needed to deploy/teardown the E2E
Headlamp instance.
This change aligns all E2E infrastructure to use headlamp-dev:
- .github/workflows/e2e.yaml: E2E_NAMESPACE=headlamp-dev
- scripts/deploy-e2e-headlamp.sh: default namespace and comments
- scripts/teardown-e2e-headlamp.sh: default namespace
- deployment/e2e-ci-runner-rbac.yaml: namespace and add missing events
permission (already present in infra copy)
Refs: PRI-423
Co-authored-by: Chris Farhood <chris@farhood.org>
Co-authored-by: Paperclip <noreply@paperclip.ing>
* fix: override lodash >=4.18.0 to patch code injection vulnerability
GHSA-r5fr-rjxr-66jc is a code injection vulnerability in lodash
below 4.18.0. The vulnerable transitive dependency comes through
@kinvolk/headlamp-plugin.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
* fix: update pnpm-lock.yaml to satisfy lodash override
The package.json pnpm.overrides requires lodash >=4.18.0, but the lockfile
had an older version. Regenerated lockfile with pnpm install.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* fix(e2e): scope heading locators to main content area
Fix E2E test failures by scoping heading locators to the main
content area instead of searching the entire page. This prevents
matching headings in the sidebar or other non-content areas.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* fix(e2e): scope remaining getByText to main element
The 'Cluster Score' text matcher was still searching the entire page
instead of being scoped to the main content area. This could cause
false positives if the same text appears in the sidebar.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* ci: trigger fresh E2E run
Re-pushing to trigger a new CI run since the last E2E was cancelled.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* fix(e2e): use [role=main] instead of main element
Switch from 'main' element selector to '[role="main"]' attribute
selector for better compatibility with Headlamp's app structure.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* fix(e2e): hybrid approach - unscoped headings, main-scoped text
Use broader heading selectors matching intel-gpu pattern, but
keep text checks scoped to main element to avoid sidebar conflicts.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
* ci: re-test original code to verify baseline
---------
Co-authored-by: Gandalf the Greybeard <gandalf@privilegedescalation.dev>
Co-authored-by: Claude Opus 4.7 <noreply@anthropic.com>
Co-authored-by: Paperclip <noreply@paperclip.ing>
When the E2E deploy step fails (rollout timeout, pod not ready, etc.),
previously required manual cluster investigation to diagnose the root
cause. This heartbeat had to grep CI logs and query kubectl separately
to determine a :latest image drift issue.
The new step captures pod state, pod describe output, and recent namespace
events immediately when a failure occurs — surfacing the root cause
directly in the CI run log.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
The :latest tag caused E2E flakiness when a newer Headlamp image was
pulled on some cluster nodes (IfNotPresent policy) but not others.
Concurrent E2E runs on main saw different image versions, and the newest
:latest (sha256:89c6c65) failed to pass the readiness probe within 120s.
Pin to v0.40.1 — the same version running in production (kube-system) —
so all nodes use the same cached digest and CI is deterministic. Update
this pin when Headlamp is upgraded in production.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
kubectl apply without prior deletion patches in place: if the pod spec is
unchanged between runs, no rollout is triggered and a potentially degraded
pod from a prior run keeps serving. This caused the auth.setup.ts timeout
(waiting for the "use a token" button) even when no concurrent runs were
present — the headlamp-e2e pod was in an inconsistent state from a previous
run that didn't tear down cleanly.
Changes:
- deploy-e2e-headlamp.sh: delete Deployment, Service, and ServiceAccount
(with --wait) before applying, guaranteeing a fresh pod each run
- auth.setup.ts: add explicit waitFor({ state: 'visible', timeout: 15_000 })
before the "use a token" button click, so failures surface at 15 s with a
clear locator error rather than silently timing out at 60 s
Fixes the pre-existing infra issue blocking PR#110.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
cancel-in-progress: true would cancel in-flight E2E runs when a new one
arrives. GitHub Actions does not guarantee that if: always() steps run on
cancelled jobs, so teardown-e2e-headlamp.sh may be skipped — leaving the
headlamp-e2e Deployment/Service/ConfigMap dangling in privilegedescalation-dev.
Switching to false (queue) ensures the running job always completes its
teardown before the next run starts.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
Prevents parallel E2E runs from conflicting over the shared
headlamp-e2e Helm release in privilegedescalation-dev. With
cancel-in-progress: true, a new push cancels any in-progress
run on the same repo — only one E2E suite runs at a time.
Observed failure: PR#109 and PR#108 ran concurrently and the
auth setup in PR#109 timed out, likely due to resource contention
on the shared headlamp-e2e instance.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
Replaces the duplicated Renovate config with a simple extend from the
org-level preset (privilegedescalation/.github:renovate-config). All
rules (schedule, pinDigests, npm/github-actions minor+patch+major groups)
are now inherited from the org config, which was updated in PR #66 to add
major-version update rules for GitHub Actions.
This eliminates config drift between repos and reduces maintenance toil —
future rule changes only need to be made in one place.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.